Choosing Charger Power from a Vehicle Schedule Instead of a Brochure

Choose charger power by starting with the energy vehicles need and the time available to deliver it. A higher equipment rating can help some schedules, but it does not automatically shorten every stop or solve a site supply constraint. The first useful document is a vehicle schedule, not a comparison of the largest numbers on product sheets.
That schedule gives the project team a practical basis for selecting equipment and explaining which assumptions still need verification.
Describe the next departure requirement
For each representative vehicle, record arrival time, departure time and the additional energy needed for its intended work. Distinguish a necessary departure target from a preference to charge to full. Include the range of normal days, not only the quietest operating pattern.
Use consistent measurement boundaries. Energy added to a vehicle battery and energy taken from the site's electricity supply are not necessarily identical. State where the energy requirement applies before comparing it with charger or grid ratings.
The Department of Energy's smart charging guidance identifies schedules, dwell time and operating information as important inputs. Where vehicle state of charge is not available through the charging system, identify how the fleet will obtain a usable planning estimate instead of treating an unknown value as known.
Calculate an initial average requirement
Take a hypothetical vehicle needing 60 kWh of additional battery energy during a three-hour connection window. The arithmetic average is 20 kW delivered to the battery. That is a starting requirement, not a recommendation for a 20 kW nameplate charger.
The actual plan must allow for the vehicle's charging capability, relevant losses, changes in charging rate and time spent connecting or waiting. If the usable window is shorter than the parking period, use the shorter window in the calculation.
Repeat the check for early departures and late arrivals. A schedule that works on a normal ten-hour overnight stay may fail for a vehicle that returns late and leaves early, even if its daily energy use is unchanged.
Check what the vehicle can accept
Vehicle limits can constrain the benefit of a higher charger rating. For AC charging, the vehicle's onboard charging capability matters; DC charging also depends on the vehicle's acceptance under the current battery conditions. Charging is not guaranteed to remain at the equipment's maximum throughout a session.
The Alternative Fuels Data Center explains charging time as a result of vehicle, battery, equipment and supply conditions. Use manufacturer information and representative tests where available to check the proposed schedule, particularly where the timing margin is small.
BENY's AC and DC charger portfolio offers equipment families to consider against that schedule. Compare an actual offered configuration with the vehicles and site constraints; the category's range is not a promise that every vehicle can use its highest available power.
Add simultaneous demand and the site limit
Next, place the vehicles on one timeline. Identify which charging needs overlap and what total supply is available after other site demand. Adding individual charger ratings can describe installed output, but it does not establish the electricity the site can provide concurrently.
Suppose four vehicles each need 60 kWh during the same ten-hour window. Their combined average requirement is 24 kW at the stated vehicle-energy boundary. That calculation can justify investigating coordinated charging, but it does not prove a 24 kW site connection is sufficient. Losses, vehicle availability, allocation constraints and other loads still matter.
Where the proposal relies on scheduling or shared power, obtain the supported control arrangement and fallback behaviour. Do not count an unverified software feature as usable electrical capacity.
Choose a configuration with an explicit service margin
Ask the project team to show the schedule under normal operation and a realistic difficult day. Include the agreed late arrival, unavailable charging position or reduced site allowance, rather than adding an unexplained percentage to every rating.
Compare configurations by whether they meet the vehicle commitment, what site work they require and what happens when conditions depart from the plan. A more powerful unit may be appropriate for a short turnaround, while a longer dwell time may support a different arrangement.
Keep the chosen assumptions in the procurement and handover records. Then the operator can recognise when a new vehicle, route or departure time requires the charging plan to be reviewed. The rating becomes the result of the operating requirement, with a clear explanation of what it can deliver and under which conditions.